Loading
Loading...
Skip to main content

The Address Hotel – Renovation

DBB’s scope of works for the project, completed in conjunction with our sister company, BK Gulf LLC, is summarised below, and was carried out by over thirty subcontractors across the programme period:

  • demolition and strip out work of the building, including façade,interiors and FF&E items;
  • specialist concrete repair, including post-tensioning works;
  • new primary and secondary structural works;
  • Major alterations to existing structures to suit the new design of the hotel;
  • Full ACP replacement on the façade to new DCD regulations, replacing 30,000m2 of panels;
  • complete glazing replacement to over 15,000m2 of facade, incorporating new designs for specific areas of the hotel;
  • Replacement and additions to the facade access & maintenance systems;
  • Comprehensive refurbishment and enhancement of 22no existing elevators and the addition of 1no new elevator;
  • Completely new interior design & MEP fit-out of all the hotel common areas, restaurants & cafes, the spa & fitness centre and 225no guestrooms, suites and Royal Suite;
  • New F&B outlets & equipment, including back of house kitchens, standalone units, joinery-integrated and façade-integrated installations;
  • Major alterations to hard & soft landscaping areas, including water features, mature trees and tensile fabric structures;
  • New FLS installation to meet the current regulations;
  • Plant room alterations;
  • Full interior design & MEP fit-out of the apartment common areas & 185no apartments;
  • Clean-down and interior design & MEP refresh of 460no apartments;
  • Refresh and minor alterations to all back of house and car parking areas.
Client

EMAAR Properties PJSC


Project

DDD – The Address Downtown – Phase 2- Reinstatement & Refurbishment Works


CONSULTANT

AECOM Middle East LLC